How transit agencies use solar power to charge electric buses
Solar panels on bus depots are how a growing number of transit agencies use solar power to charge electric buses. At least 4 United States transit agencies, in Montgomery County, Maryland, Santa Clara County, California, Austin, Texas, and Anaheim, California, have each built or are building one. Some own the panels outright. Others sign a contract that lets a private company build and own the panels instead, paying for the power over many years rather than upfront, under a deal called energy as a service or a power purchase agreement.
The largest project pays nothing upfront
The newest bus depot in Montgomery County pairs 5.65 megawatts of solar panels with a 2 megawatt, 6.88 megawatt hour battery that stores solar power for buses charging at night, according to the joint groundbreaking announcement from the county and AlphaStruxure, the company building and owning the system. The depot also gets a 1 megawatt hydrogen electrolyzer, a machine that uses spare solar electricity to split water into hydrogen fuel and store it, the same announcement states. The county pays nothing upfront, and the depot is expected to run 200 zero emission buses by 2035, part of 335 buses planned across 2 depots in the county.
This project is the largest renewable energy powered transit depot and transit depot microgrid in the nation.
Marc Elrich, Montgomery County executive, speaking at the groundbreaking for the newest depot. Source 1.
An earlier depot in the same county proved the model first
Montgomery County already tested this approach once. Brookville, an earlier and smaller depot in the same county, opened on November 1, 2022 with 1.6 megawatts of solar panels, a 3 megawatt battery and 1.8 megawatt gas fired backup generators, making a 6.5 megawatt microgrid, according to Canary Media. The county paid nothing upfront, and Brookville was built to run 70 electric buses by 2026.
Newest Montgomery County depot from source 1. Brookville depot from source 2. Anaheim Transportation Network from source 5. VTA and CapMetro state no capacity figure in kilowatts or megawatts and are left out.
Show the numbers
| Newest depot Montgomery County | 5.65 |
| Brookville depot Montgomery County | 1.6 |
| Anaheim Transportation Network | 0.514 |
Austin and Anaheim chose 2 more financing paths
CapMetro, the transit agency in Austin, Texas, is paying its own money instead of signing a service contract, 34 million dollars, funded locally, for a 12 acre canopy of more than 7,000 solar panels over its North Operations bus yard, according to HOLT Renewables, the company building it. Construction started in October 2023, and the canopy is meant to support more than 200 zero emission buses that charge through pantograph chargers, arms that lower from an overhead structure onto a bus roof to charge it fast between routes.
This revolutionary project represents one of the largest deployments of pantograph bus chargers in North America.
David Carr, director of zero emission vehicles at CapMetro. Source 4.
Anaheim Transportation Network took a third path, a 20 year power purchase agreement with bp pulse and REC Solar, who built and still own a 514 kilowatt solar canopy and sell the agency its power. The canopy is stated to cover 25% of total expected energy use and is projected to save 4.8 million dollars in fuel costs over 20 years, according to a joint statement from the 3 companies. The agency runs 80 battery electric buses from the site.
Santa Clara VTA Cerone from source 3. Brookville depot from source 2. Anaheim Transportation Network from source 5. Newest Montgomery County depot from source 1. CapMetro states only that it supports more than 200 zero emission buses, an open ended figure rather than a clean count, so it is left out of this chart and stated in prose instead.
Show the numbers
| Santa Clara VTA Cerone, in 2026 | 35 |
| Brookville depot, by 2026 | 70 |
| Anaheim Transportation Network | 80 |
| Newest Montgomery County depot, by 2035 | 200 |
The pattern is about depots, not passenger stations
None of the 5 projects examined puts solar panels at a passenger station. Every one sits at a bus depot or a maintenance yard, where buses charge overnight or between routes. For other agencies weighing the same move, the finding is not whether to add solar power, but which of the 2 payment models fits the budget, own the array and its upfront cost, or pay a service contract over time instead.