UK community battery call for evidence finds just 12 shared battery projects toward a 10 to 12 gigawatt target for 2030

The Department for Energy Security and Net Zero closed its call for evidence on 30 July 2026 after asking whether shared community batteries should reach renters and flat dwellers who cannot install their own. Its own document counts just 12 identified projects against a target of 10 to 12 gigawatts of consumer led flexibility capacity by 2030, up from 2.5 gigawatts in 2024.

124planned or operational shared community battery projects the United Kingdom government has identified so far, toward a 10 to 12 gigawatt target for 2030
1,3004pounds a year is the equivalent electricity cost saving reported at Hazelmead, a 54 home development in Bridport, Dorset, with a 15% bill saving guarantee
2.54gigawatts of consumer led flexibility capacity was operating in 2024, compared with a government target of 10 to 12 gigawatts by 2030

What the UK community battery call for evidence asked

The United Kingdom Department for Energy Security and Net Zero opened a call for evidence on community batteries on 4 June 2026 and closed it on 30 July 2026. A community battery is a shared battery, often about the size of a garden shed, that stores electricity for several homes at once rather than for 1 household own battery, so a person who rents or lives in a flat and cannot fit solar panels or a battery of their own can still get the benefit. The department asked network companies, battery makers, energy suppliers, councils, social housing landlords and community groups whether and how the country should expand community batteries, drawing on its own 31 page document, which asks 34 numbered questions on definitions, barriers, safety and examples from other countries.

The government own document states the country has identified only 12 planned or operational shared community battery projects so far. That falls against its own ambition, set out in the Clean Power 2030 Action Plan, for 10 to 12 gigawatts of what it calls consumer led flexibility capacity by 2030, meaning electricity capacity that homes and small devices, rather than power stations, can turn on or off to help balance the grid. The government states plainly that 12 projects will not get the country there, up from 2.5 gigawatts of that flexibility capacity operating in 2024.

United Kingdom consumer led flexibility capacity is far below its 2030 target
024681012142.5Operatingin 2024102030 target,low end122030 target,high endgigawatts

The government states 12 identified community battery projects are not on track to contribute meaningfully to this target.

Source 4.

Show the numbers
Operating in 20242.5
2030 target, low end10
2030 target, high end12

Three ways a community battery could be wired, in the government own words

Reading the full call for evidence document directly, rather than only coverage of it, shows the government has not settled on 1 design for a community battery. It sets out 3 categories for people to react to. A shared behind the meter battery wires directly into each flat own circuitry inside a block, giving a direct bill saving with no need to switch energy supplier. A microgrid battery sits behind a landlord single meter and ahead of individual household meters, serving a whole development, and residents have to use a specified supplier to see the saving. A virtual private network battery connects to the wider electricity network in front of residents own meters, working like a small version of a grid scale battery while sending its earnings back to residents, and it also requires residents to switch to a common supplier.

Energy Minister Michael Shanks tied the plan to household bills and to reaching renters and flat dwellers who cannot install their own equipment.

If households are going to feel the full benefit of clean power, we need a more flexible energy system - and community batteries can help deliver it.

Michael Shanks, Energy Minister, United Kingdom Department for Energy Security and Net Zero. Source 2.

A domestic case study, and how the government sizes up others

The government points to Hazelmead, a 54 home development in Bridport, Dorset, which reports an annual electricity cost reduction equivalent to 1,300 pounds a home and carries a 15% bill saving guarantee. Its own document also cites community battery case studies of very different sizes, in Germany, the Netherlands, Western Australia and a project in Brixton, showing how much the number of homes 1 project can serve varies.

Community battery case studies the United Kingdom government cites vary widely in size
Germany, Flex4Energy23Netherlands, Buurtbatterij35Hazelmead, Bridport, Dorset54Brixton Urban Energy Club63Western Australia, PowerBank5330100200300400500600households or participants

The Western Australia figure counts 533 participants across 3 project phases, not individual households. All 5 figures are case studies the United Kingdom government document cites as evidence, not projects the United Kingdom itself runs.

Source 4.

Show the numbers
Germany, Flex4Energy23
Netherlands, Buurtbatterij35
Hazelmead, Bridport, Dorset54
Brixton Urban Energy Club63
Western Australia, PowerBank533

Allume Energy, an Australian company that already runs shared battery systems for apartment blocks, gave evidence to the government through its general manager for Europe.

Through our technology, residents have seen their grid energy costs cut by up to 40%.

Jack Taylor, General manager Europe, Allume Energy. Source 2.

What happens next

As of this research the call for evidence has closed with no government response published and no date given for one. This is evidence gathering that could lead to a future policy, not a scheme any renter or flat dweller can join today.

Sources

  1. New proposal says neighborhood scale batteries could cut bills by storing cheap power as UK braces for 2026 World Cup energy surge. Ray Brennan, The Cool Down. Published 2026-06-16. Accessed 2026-09-21.
  2. New proposals to cut bills with community batteries. Department for Energy Security and Net Zero, United Kingdom government. Published 2026-06-04. Accessed 2026-09-21.
  3. Assessing the case for community batteries. Department for Energy Security and Net Zero, United Kingdom government. Published 2026-06-04. Accessed 2026-09-21.
  4. Assessing the case for community batteries, call for evidence, accessible webpage. Department for Energy Security and Net Zero, United Kingdom government. Published 2026-06-04. Accessed 2026-09-21.
  5. Parkside, South Australia. Allume Energy. Published 2026-05-04. Accessed 2026-09-21.

Was this article helpful

Back to the home page